About The Founder

Engineer Godfrey Linsangan
Founder, Project Manager and Builder of GML Commercial Builders

About

Godfrey Linsangan began his career in construction in 1987. Godfrey has 30+ years of heavy construction experience and earned dual degrees in Civil and Environmental Engineering in 1985.

Throughout his career, he has been responsible for administering and managing Building Construction Projects, Testing procedures, Performing inspections and directing construction procedures on Vertical and Horizontal Projects.

Education and Certificates:

Bachelor of Science in Civil Engineering, Far Eastern University, 1982
Bachelor of Science in Sanitary Engineering, National University, 1985
United States Army Corps of Engineers, Construction Quality Management Certified
30 hour OSHA Certificate, 2018
CPR First Aid, 2018
Scaffold Competent Person, 2019
HMA Airfield Paving Workshop, Little Rock Airforce Base, 2015
Concrete Airfield Paving Workshop, Little Rock Airforce Base, Arkansas, 2016
GSA Federal Security lD for Federal Projects, Validated by Homeland Security

Construction Experience:

GML Commercial Builders
Construction of New Religious Facility from Ground and up. (Structural Steel with Stucco Finishing).
Mosque, 1-1900 North Lamar Blvd , Austin TX
Project Manager, 2019-2021, 25,000 SF +-

lronwood Commercial Builders lnc.
Building 829 Stucco Repair at Presidio Monterey, USACE Project
Quality Control Manager/Project Supt. 2018-2019

David Boland lnc.
USACE Army Reserve Center, Camp Parks, Dublin CA
S18M USD Construction Project
Quality Control Manager 2O17-2018

Sundt Construction lnc.
USACE Runway Repair at Little Rock Airforce Base
$104,000,000.00 construction
Project Quality Control Manager/Alternate QCM 2015-2017

SUNDT Construction lnc.
USACE Combat Aviation Brigade Hot Refuel Facility, Fort Bliss, El Paso, TX $9,440,609, The project consisted of a fueling and parking area for helicopters at Fort Bliss. The project included earthwork, site infrastructure, electrical, mechanical, HMAC, and 10,000 cy of PCCP.
Quality Control Manager, 09/2014-05/2015

SUNDT Construction lnc.
USACE Repair Runway Center Keel and Asphalt Section, Minot AFB, Minot, ND
$32,787,350, The project consisted of removal and replacement of the center keel section of the runway. The project included earthwork, utilities, airfield electrical work, HMAC and 38,000 cy of PCCP.
Alternate Quality control Manager, 06/2014-09/2014

SUNDT Construction lnc.
USACE Fort Bliss Replacement Hospital Project, Fort Bliss, El Paso, TX $24,209,981. The project consisted of a structural concrete subcontract for the new construction of the 1,132,237 sf Army Hospital at Fort Bliss. Work included, final grading work, miscellaneous surfacing, reinforcing steel and 63,000 cy of structural concrete and slab work.
Quality Control Manager, 1/2014-06/2014

SUNDT Construction lnc.
USACE William Beaumont Army Medical Center Site infrastructure improvements, El Paso, TX $47,508,475. The project constructed the site infrastructure prior to the new $1B Army Hospital at Fort Bliss. Construction included earthwork, utilities, electrical, parking facilities, access roadways, structures, and a new traffic interchange with interstate 10.
Quality Control Manager, 08/2011-01/2014

SUNDT Construction lnc.
USACE Fort Bliss Community Facilities lnfrastructure, Fort Bliss, El Paso, TX
$25,027,156. This project constructed the site infrastructure prior to the construction of the Community Facilities, The project included earthwork, utilities, concrete flatwork, electrical, and HMAC.
Quality Control Manager, O4/2OO9-05/2010

SUNDT Construction lnc.
USACE Armed Forces Reserve Center – Bell, CA
$62,816,000, Design and construction of an Armed Forces Reserve Center including a L78,000-squarefoot administration/training building, a 50,000-square foot organizational maintenance shop and a 20,000-square foot storage facility.
Field Engineer, 05/2O07-O4/2009

Eureka Construction lnc.
Construction company specializing in utility and site work construction in Guam. Work consisted of concrete flatwork, earthwork and site utilities as a subcontractor and prime contractor on projects sized from $200,000 to $5,000,000.
Project Engineer 1999-2007

Hanjin Construction lnc.
Guam lnternational Airport Expansion, Tamuning, Guam
$89,000,000 Construction of a new airport terminal at the Guam international Airport consisting of 500,000 sf of office space, restaurant and retail areas. Project also included new airfield apron and taxiway paving. The project included earthwork, utilities, electrical, terminal construction and 100,000 cy of PCCP.
Project Engineer, 1996-1999

Hanil Development/Haniin Const. lnc
Explosive Ordinance Disposal Building Training Facility, Paraloft Tower, and Maintenance Building, US Naval Station, Guam $14,000,000, Construction of a new maintenance building for boats and vehicles and parachute drying tower. The project included earthwork, site concrete, utilities, building and tower construction, and land stabilization by steel pile installation.
Project Engineer, 1994-1996

Hanil Development/Hanjin Const. lnc.
HC-5 Squadron Maintenance Hanger Facility, Anderson Air Force Base, Guam
$22,000,000, Construction of taxiway access and 120,000 sf maintenance hangar for helicopters and planes for the HC-5 rescue unit of the US Navy. Project included earthwork, utilities, airfield electrical, hangar construction, and 40,000 cy of PCCP.
Assistant Quality Control Manager, 1992-1994

Duenas and Associates, Tamuning, Guam
General site and road layout and survey calculations.
Party Chief Surveyor, 1989-1992

Black Construction, Tamuning, Guam
General site and road layout and survey calculations.
Party Chief Surveyor, 1987-1989